top of page

Before we start:

  1. First things first. If you have not yet completed a nomination form, then please do so here before you proceed.

  2. Check that you have met the PDRS eligibility requirements (see below).

  3. Check that you have received a welcome email from your VPP provider.

If you have questions about the contents of the nomination form, then please contact us here.

I'm a paragraph. Click here to add your own text and edit me. It's easy.

Upload image
Upload image
Upload file
Upload file
Upload image
Upload image
Upload file
Upload file

PDRS activity requirements:


Activity requirements for BESS2 in the PDRS Rule require that:

 

  • Batteries are listed on the Clean Energy Council’s list of approved batteries, which is the product list specified by the Scheme Administrator, and:

    • have a combined usable battery capacity that is greater than 2 kWh and less than 28 kWh

    • have a minimum 6 years remaining on warranty

​

  • The battery warranty must define normal use conditions during the operation of the battery as not being less than:

    • ​a minimum ambient temperature range of -10 °C to 50 °C 

    • a minimum warranted cumulative energy throughput equivalent to 2.8 MWh per kWh of Usable Battery Capacity

​

  • Participation in the VPP must not void or diminish the battery warranty below the conditions listed above.

​

  • There must be no life support equipment at the premise. Life support equipment means any of the following:

    • ​An oxygen concentrator

    • An intermittent peritoneal dialysis machine

    • A kidney dialysis machine

    • A CPAP respirator

    • Crigler Najjar syndrome phototherapy equipment

    • A ventilator for life support

    • Any other equipment that a registered medical professional certifies is required for a person residing at the premises for life support.

​​

  • The premise must have a solar PV system either existing or installed with the battery

​

  • The premise must be a residential site or a business site where annual electricity consumption is below

100MWh. 

​

​

  • The VPP contract must be for the provision of demand response capacity with a Demand Response

Aggregator for at least 12 months

​

​

  • No previous incentive has been claimed under the PDRS for connecting your battery to a VPP. The BESS2

incentive is only available once for the lifetime of the system.

​

bottom of page