Search results
73 results found with an empty search
- EC Focus Helps Levande Achieve Australia's First SBTi Buildings Emissions Target
EC Focus supported Levande in becoming the first Australian corporation to have its emissions reduction target approved under the 2024 Science Based Targets initiative (SBTi) Buildings Sectoral Decarbonisation Pathway. EC Focus Helps Levande Achieve Australia's First SBTi Buildings Emissions Target Project Overview EC Focus supported Levande in becoming the first Australian corporation to have its emissions reduction target approved under the 2024 Science Based Targets initiative (SBTi) Buildings Sectoral Decarbonisation Pathway. Key services provided by EC Focus included: Gap analysis of Levande’s GHG inventory against SBTi requirements Modelling science-based target options using the 2024 SBTi buildings guidance Support in obtaining third-party assurance of emissions data Full guidance through submission and validation Alignment with GHG Protocol and SBTi standards
- Art Gallery of Nsw chilelrs | EC Focus Pty Ltd
ART GALLERY OF NSW CHILLERS Project Overview The Art Gallery of NSW, replacing its old fluid chillers with modern high-efficiency chillers and upgrading its cooling towers, water pumps and control systems, sought help from an ACP under the NSW Energy Savings Scheme (ESS) to offset project costs. Our team of skilled M&V professionals qualified us as the right company for this complex project, developing energy regression models to combine visitor information, electricity consumption and climate data to account for variable temperature and humidity. Energy Conservation accurately determined the improved cooling efficiency by monitoring chiller energy consumption, chilled water flow and temperatures to compare specific chiller performance before and after the upgrade. Using the International Performance Measurement and Verification Protocol (IPMVP) to verify our energy models and the Gallery’s significant energy savings, EC confirmed annual savings of 1,200 Megawatt-hours, representing 15% of total Gallery consumption. Working with Energy Conservation, the Art Gallery of NSW not only achieved annual savings of $140,000 in energy costs and 1,200 tonnes of CO2 equivalent emissions, but also secured funding of over $100,000 through the creation of Energy Savings Certificates.
- Circular Economy | EC Focus Pty Ltd
Circular Economy EC Focus supports your transition from a linear model to circular systems that prioritise waste reduction and resource efficiency. Our services include strategic advisory on circular business models, optimisation of waste management systems, and certifications that recognise and validate performance and services. Bin Trim Our Bin Trim Waste Assessments help businesses better understand their waste generation and identify practical opportunities to reduce waste, improve recycling, and cut costs. Backed by over a decade of experience, our expert team supports businesses to optimise waste management, boost recycling rates, and enhance sustainability performance. Businesses that join the program can also access Bin Trim Rebates—funding of up to $50,000—to help implement recommended actions. Fully funded by the NSW EPA, this valuable service is provided at no cost to eligible NSW businesses. Learn more NABERS Waste As registered NABERS Assessors, we manage different portfolio's rating and offer comprehensive support to help your portfolio meet their sustainability targets. Our specialized expertise in NABERS Waste applies to office buildings, hotels, and shopping centers. We provide tailored consultancy and hands-on support, collaborating with key stakeholders to identify improvement opportunities and implement efficiency strategies for enhanced performance. Waste Audits Our Waste Diagnosis service provides a comprehensive assessment of your business' waste management practices, identifying opportunities to reduce waste generation, improve recycling, and optimize disposal in light of upcoming organic separation mandates. We develop tailored plans to ensure compliance, reduce costs, and achieve sustainability goals. GECA We help you obtain green ecolabel GECA certification for your waste services, demonstrating your environmental superiority and industry leadership. Material Flow Analysis By analyzing the flow of waste materials within your site or organization, we identify opportunities to reduce waste generation and improve your product stewardship and recovery outcomes. Our MFA include system boundary definition, data collection and analysis, flow diagram development, waste quantification and qualification, hotspot identification, and the development of waste reduction and recovery strategies. Through our in-depth MFA, we assist organizations in mapping their Scope 3 emissions and empower them to achieve their sustainability goals, reduce costs, and comply with environmental regulations. Waste Management Training Our educational workshops and training sessions on waste and the circular economy are designed to build practical capability across your organisation—from frontline staff to management. We deliver tailored content aligned with your operational procedures, covering key principles, regulatory context, best practices, and emerging trends, with a strong focus on day-to-day application. Through interactive sessions, group exercises, and online modules, we help teams understand the value of resource efficiency, reduce waste, and contribute to more circular and sustainable operations. Related News & Insights Why Shopping Centres Should Be Preparing for NABERS Waste Today COP30: Key outcomes for Australian Businesses Navigating NSW’s New Organic Waste Requirements: Is Your Business Ready? Get in contact with us Name* Email* Company Role Write a message Submit
- Safeguard Acceleration Program - Air Conditioning | EC Focus Pty Ltd
Get up to 50%* higher incentives for your air conditioning installations with EC! Fill the form below to find out about more! Why EC Focus EC Focus is an Accredited Certificate Provider (ACP) under the NSW Energy Savings Scheme (ESS), with strong experience delivering air conditioning upgrades for residential and commercial sites, managing the end to end paperwork and rebate process through to certificate creation and compliance so installers can offer government backed discounts on high efficiency AC systems. Submit your details below to get a callback and find out more!
- VPP Submission | EC Focus Pty Ltd
Before we start: First things first. If you have not yet completed a nomination form, then please do so here before you proceed. Check that you have met the PDRS eligibility requirements (see below). Check that you have received a welcome email from your VPP provider. If you have questions about the contents of the nomination form, then please contact us here . Please note that your system must meet PDRS requirements listed at the bottom to be eligible for the incentive. Battery Select a battery Quantity I'm a paragraph. Click here to add your own text and edit me. It's easy. Battery In-situ Photo Upload image Solar PV Photo Upload image Signed VPP Contract Upload file Electricity Bill Upload file Battery Nameplate Photo Upload image Screenshot of Battery App Upload image VPP Welcome Email Upload file Installation Date Evidence Upload file I am the account holder as it appears on my electricity bill I have read IPART's BESS2 Fact Sheet I confirm that my battery system meets PDRS requirements* I consent to EC Focus contacting me regarding this submission and for my information to be handled in accordance with EC Focus’ Privacy Policy I have read and understood EC Focus’ Terms and Conditions relating to this activity The information I have provided is accurate and is not misleading by inclusion or omission Submit PDRS activity requirements: Activity requirements for BESS2 in the PDRS Rule require that: Batteries are listed on the Clean Energy Council’s list of approved batteries, which is the product list specified by the Scheme Administrator, and: have a combined usable battery capacity that is greater than 2 kWh and less than 28 kWh have a minimum 6 years remaining on warranty The battery warranty must define normal use conditions during the operation of the battery as not being less than: a minimum ambient temperature range of -10 °C to 50 °C a minimum warranted cumulative energy throughput equivalent to 2.8 MWh per kWh of Usable Battery Capacity A minimum warranted cumulative energy throughput equivalent to 3.65 MWh per kWh of Usable Battery Capacity where the Implementation Date is on or after 1 April 2026 Participation in the VPP must not void or diminish the battery warranty below the conditions listed above. There must be no life support equipment at the premise. Life support equipment means any of the following: An oxygen concentrator An intermittent peritoneal dialysis machine A kidney dialysis machine A CPAP respirator Crigler Najjar syndrome phototherapy equipment A ventilator for life support Any other equipment that a registered medical professional certifies is required for a person residing at the premises for life support. The premise must have a solar PV system either existing or installed with the battery The premise must be a residential site or a business site where annual electricity consumption is below 100MWh. The VPP contract must be for the provision of demand response capacity with a Demand Response Aggregator for at least 12 months No previous incentive has been claimed under the PDRS for connecting your battery to a VPP. The BESS2 incentive is only available once for the lifetime of the system.
- Terms and Conditions | EC Focus Pty Ltd
EC Terms and Conditions

